lab2dateMolecular Analysis
All case studiesEPOCH BioDesign

EPOCH BioDesign sourced a discontinued mass spec component in 11 days

11-day sourcing

EPOCH BioDesign

A failed ion source on a 2014 Waters TQ-S would have meant a 6-month custom rebuild. Concierge sourcing found a working unit in Australia.

The crisis

A Waters Xevo TQ-S ion source failed in mid-pipeline. Waters quoted 26-week lead time on the replacement (legacy part). EPOCH would have had to either rebuild internally or stall the project.

The search

Our sourcing team queried 84 suppliers in 6 countries. On day 9 we found a working source unit at a private analytical lab in Melbourne that had decommissioned the same instrument.

The result

Source unit cross-shipped via air freight, installed on day 14, full validation by day 17. Total elapsed time from request to operational: 11 business days. Cost: 65% under OEM list.